国产精品亚洲一区二区在线观看-在线黑人抽搐潮喷-久久人人爽天天玩人人妻精品-亚洲日韩av一区二区三区四区-永久不封国产av毛片

Welcome to Tianjin Guoce Aerospace Technology Co., Ltd!

Tianjin GuoCe Aerospace Technology Co., Ltd.

Inspection Industry Solution Provider

We are more professional.

Testequipment

Telephone:18322499311

Mobile phone:18920407795

Fax:022-22145487

E-mail:10533646999@qq.com

Address:Chagugang Town, Wuqing District, Tianjin

Wind pressure testing machine

  • Hot Line:18322499311

Highlight-color: rgba(255, 255, 255, 0); margin: 0px; color: rgb(102, 102, 102); font-family: "microsoft yahei", 宋體, Arial; font-size: 14px;">



1、 Main functions of the device:

The Wind pressure testing machine is used to determine whether the equipment can maintain structural integrity and work in high wind speed environments. It is mainly suitable for evaluating equipment working outdoors in mountainous, coastal, island, and other areas, as well as equipment placed on the open deck of ships for work.


2、 Performance indicators and system composition of wind pressure testing machine:


Model GC-FY-80

Sample restrictions: This testing equipment prohibits the testing of flammable, explosive, and volatile substance samples; Testing for storing samples of corrosive substances, testing for storing organisms, testing and storing samples of strong electromagnetic emission sources

Main technical parameters

Environmental conditions for use: ambient temperature of 5-35 ℃, relative humidity ≤ 85% RH

Blow off cross-sectional area 1000mm × 1000mm (fan outlet cross-sectional area)

Wind speed (0-45) m/s (wind speed at the outlet of the fan) adjustable

Air volume: 110600-181800m3/h (1843-3030m3/min)

Wind pressure 951-1402 Pa

Maximum specimen size ≥ 2000mm × 2000mm

The external dimensions of the machine are approximately 4200 × 3700 × 1500mm (W * H * D)

Sample Placement Room

To avoid the influence of surrounding air flow on the wind direction, the sample is placed in a closed room and the laboratory is sufficiently large. The horizontal dimension is at least 3 times the length of the sample placement, and the vertical and vertical dimensions are at least 2 times the length of the sample placement. An automatic pressure relief device or exhaust duct is also installed indoors

Test meets the conditions GJB150.21A-2009 Military Equipment Laboratory Environmental Test Methods Part 21: Wind Pressure Test

GB/T2423.41-94 Basic Environmental testing procedures for electrical and electronic products: Wind pressure test method

Maximum power 75KW

Maximum current of 120A

 

Power supply conditions

And power supply

AC 380V three-phase four wire+protective grounding; The allowable voltage fluctuation range is 10% V;

The allowable frequency fluctuation range is 50 ± 0.5HZ; TN-S power supply or TT power supply

The grounding resistance of the protective grounding wire is less than 4 Ω

Require users to configure corresponding capacity air or power switches for the equipment at the installation site, and this switch must be independently controlled. When placing powered samples in the equipment use box, please use an external power source for the sample power supply and do not directly use the local power supply;

The machine structure adopts a volute centrifugal fan as the power source

The snail shell is made as an assembled type, with a rotating air outlet angle that can be adjusted by ± 90o

Install a lifting frame at the bottom of the fan, which can be raised and lowered vertically with an adjustable range of 0-1000mm

Electrical control system

Centrifugal blower as power source, easy to use and maintain

The speed control of the fan adopts a frequency converter and a variable frequency motor to control the motor speed, achieving the purpose of controlling the wind speed

Requirements for storage, transportation environment, and installation site

Storage environment requirements: The equipment environment temperature should be maintained within 0 ℃ to+35 ℃

The installation site requires that the distance between the left, right, and rear wall panels of the test box and the wall should not be less than 800mm, and the distance between the front and the wall should not be less than 1000mm. When transporting equipment, whether it is possible to enter the entrance or passage, elevator, etc., to avoid affecting the progress of your company's project.

Transportation method: Whole machine transportation



Recommended products

主站蜘蛛池模板: 久久久久久久久免费看无码| 欧美和黑人xxxx猛交视频| 久久www色情成人免费| 亚洲精品久久av无码麻| 无码人妻av一二区二区三区 | 久久久久国产精品麻豆ar影院| 亚洲制服丝袜精品久久| 中文字幕亚洲综合久久青草| 亚洲精品自产拍在线观看动漫 | 免费午夜福利不卡片在线播放| 又湿又紧又大又爽a视频| 99久久九九免费观看| 国产免费午夜福利片在线| 成人做爰69片免费看网站野花| 无码人妻丰满熟妇区五十路| 宅男666在线永久免费观看| 亚洲婷婷五月综合狠狠app| 人人妻人人爽人人添夜夜欢视频 | 亚洲精品色情aⅴ色戒| 欧美牲交黑粗硬大| 艳妇臀荡乳欲伦69调教视频| 久久久久人妻精品区一三寸| 在线不卡日本v一区二区| 亚洲精品成人网久久久久久| 国产色视频网免费| 国产精品亚洲一区二区三区| 国产传媒麻豆剧精品av| 2019精品手机国产品在线| 国产精品9999久久久久| 午夜美女裸体福利视频| 国产精品1区2区3区在线观看| 国产成人精品高清在线观看99| 日本免费人成视频播放| 国产精品美女久久久网av| 国产激情电影综合在线看| 四虎影视国产精品久久| 色婷婷综合久久久中文字幕| 国产aⅴ精品一区二区三理论片 | 奇米综合四色77777久久| 在线观看无码av网站永久免费| 七七88色|