国产精品亚洲一区二区在线观看-在线黑人抽搐潮喷-久久人人爽天天玩人人妻精品-亚洲日韩av一区二区三区四区-永久不封国产av毛片

Welcome to Tianjin Guoce Aerospace Technology Co., Ltd!

Tianjin GuoCe Aerospace Technology Co., Ltd.

Inspection Industry Solution Provider

We are more professional.

Testequipment

Telephone:18322499311

Mobile phone:18920407795

Fax:022-22145487

E-mail:10533646999@qq.com

Address:Chagugang Town, Wuqing District, Tianjin

Wind pressure testing machine

  • Hot Line:18322499311

Highlight-color: rgba(255, 255, 255, 0); margin: 0px; color: rgb(102, 102, 102); font-family: "microsoft yahei", 宋體, Arial; font-size: 14px;">



1、 Main functions of the device:

The Wind pressure testing machine is used to determine whether the equipment can maintain structural integrity and work in high wind speed environments. It is mainly suitable for evaluating equipment working outdoors in mountainous, coastal, island, and other areas, as well as equipment placed on the open deck of ships for work.


2、 Performance indicators and system composition of wind pressure testing machine:


Model GC-FY-80

Sample restrictions: This testing equipment prohibits the testing of flammable, explosive, and volatile substance samples; Testing for storing samples of corrosive substances, testing for storing organisms, testing and storing samples of strong electromagnetic emission sources

Main technical parameters

Environmental conditions for use: ambient temperature of 5-35 ℃, relative humidity ≤ 85% RH

Blow off cross-sectional area 1000mm × 1000mm (fan outlet cross-sectional area)

Wind speed (0-45) m/s (wind speed at the outlet of the fan) adjustable

Air volume: 110600-181800m3/h (1843-3030m3/min)

Wind pressure 951-1402 Pa

Maximum specimen size ≥ 2000mm × 2000mm

The external dimensions of the machine are approximately 4200 × 3700 × 1500mm (W * H * D)

Sample Placement Room

To avoid the influence of surrounding air flow on the wind direction, the sample is placed in a closed room and the laboratory is sufficiently large. The horizontal dimension is at least 3 times the length of the sample placement, and the vertical and vertical dimensions are at least 2 times the length of the sample placement. An automatic pressure relief device or exhaust duct is also installed indoors

Test meets the conditions GJB150.21A-2009 Military Equipment Laboratory Environmental Test Methods Part 21: Wind Pressure Test

GB/T2423.41-94 Basic Environmental testing procedures for electrical and electronic products: Wind pressure test method

Maximum power 75KW

Maximum current of 120A

 

Power supply conditions

And power supply

AC 380V three-phase four wire+protective grounding; The allowable voltage fluctuation range is 10% V;

The allowable frequency fluctuation range is 50 ± 0.5HZ; TN-S power supply or TT power supply

The grounding resistance of the protective grounding wire is less than 4 Ω

Require users to configure corresponding capacity air or power switches for the equipment at the installation site, and this switch must be independently controlled. When placing powered samples in the equipment use box, please use an external power source for the sample power supply and do not directly use the local power supply;

The machine structure adopts a volute centrifugal fan as the power source

The snail shell is made as an assembled type, with a rotating air outlet angle that can be adjusted by ± 90o

Install a lifting frame at the bottom of the fan, which can be raised and lowered vertically with an adjustable range of 0-1000mm

Electrical control system

Centrifugal blower as power source, easy to use and maintain

The speed control of the fan adopts a frequency converter and a variable frequency motor to control the motor speed, achieving the purpose of controlling the wind speed

Requirements for storage, transportation environment, and installation site

Storage environment requirements: The equipment environment temperature should be maintained within 0 ℃ to+35 ℃

The installation site requires that the distance between the left, right, and rear wall panels of the test box and the wall should not be less than 800mm, and the distance between the front and the wall should not be less than 1000mm. When transporting equipment, whether it is possible to enter the entrance or passage, elevator, etc., to avoid affecting the progress of your company's project.

Transportation method: Whole machine transportation



Recommended products

主站蜘蛛池模板: 久久精品国产精品| 国内永久福利在线视频图片| 国产97色在线 | 免| 乱无码伦视频在线观看| 无遮挡色视频免费观看| 精品丝袜国产自在线拍av| 国产成人精品亚洲日本777| 国产亚洲精品第一综合另类| 国产婷婷综合在线视频中文| 在线点播亚洲日韩国产欧美 | 大白肥妇bbvbbw高潮| 秋霞无码av一区二区三区| 性欧美牲交在线视频| 亚洲欧美色中文字幕在线| 日日噜噜夜夜狠狠久久蜜桃| 2021亚洲国产精品无码 | 亚洲国产精品无码久久一区二区| 无码高清视频| 亚洲欧美日韩国产精品专区| 中文字幕日韩人妻在线视频| 国产午夜亚洲精品国产成人小说 | 欧美日韩免费做爰大片人| 亚洲日韩在线中文字幕第一页| 欧美中文字幕无线码视频| 少妇无码av无码专区线| 色婷婷精品大在线视频| 麻豆国产尤物av尤物在线观看| 亚洲精品四区麻豆文化传媒| 乱色熟女综合一区二区三区| 日本丰满老妇bbb| 熟女少妇丰满一区二区| 亚洲国产欧洲综合997久久| 丰满人妻一区二区三区视频53 | 熟女肥臀白浆大屁股一区二区 | av怡红院一区二区三区| 玩弄人妻少妇500系列视频| 免费视频成人片在线观看| 东京热一精品无码av| 丝袜无码专区人妻视频| 四虎国产精品永久在线动漫| 99久久无色码中文字幕人妻蜜柚 |